Tag: Pressure

  • 156 new Covid-19 cases as of noon today, tally now 2,626: Health DG (Updated)

    156 new Covid-19 cases as of noon today, tally now 2,626: Health DG (Updated)

    156 new Covid-19 cases as of noon today, tally now 2,626: Health DG (Updated) 1

    PETALING JAYA: There were 156 new Covid-19 cases, with three deaths recorded at noon today, which brings the total number of infected and deceased cases to 2,626 and 37, respectively.

    “To date, (out of the 2,626 new cases), 94 are being treated in intensive care and of these, 62 cases require breathing assistance,” Health director-general Datuk Dr Noor Hisham Abdullah said in a statement.

    He also noted that the country saw a record number of 91 patients having recovered and discharged in one day. This brings the number of those who have recovered to 479.

    There was no drastic increase of Covid-19 cases here so far.

    He explained that recording 150 to 200 cases a day is considered stable and attributes the number to active case inspections according to the ministry.

    “We have been observing cases closely and have compared the figures to other countries, to which we can say there has been no significant increase so far.”

    “What we fear is a sudden surge of between 900 to 1,000 cases in a day,“ he said.

    Hisham also shared that the Health Ministry has managed to increase the number of hospitals providing Covid-19 screening services across the nation, from 57 to 70 hospitals.

    The number of hospitals equipped to treat Covid-19 cases has also been increased from 26 to 38, thanks to cooperation from the Malaysian Armed Forces and the University of Malaya University Medical Center.

    “Seven of these hospitals are specialised in treating Covid-19 patients,” he said.

    Of the three fatalities, the 35th victim was a 57-year-old woman with a history of diabetes who had travelled to Indonesia. She was treated at the Sungai Buloh Hospital.

    Case 36 was a 47-year-old Malaysian, treated at the Sarawak General Hospital on March 23.

    Case 37 was A 46-year-old female. She had a history of high blood pressure and an autoimmune disease. She was hospitalised at the Miri Hospital in Sarawak.

    156 new Covid-19 cases as of noon today, tally now 2,626: Health DG (Updated)
    Read More
    https://www.thesundaily.my/local/156-new-covid-19-cases-as-of-noon-today-tally-now-2626-health-dg-updated-IM2196309

    Views: 0

  • ‘Chloroquine’ used to treat Covid-19 patients since first wave: Health DG

    ‘Chloroquine’ used to treat Covid-19 patients since first wave: Health DG

    ‘Chloroquine’ used to treat Covid-19 patients since first wave: Health DG 2

    PUTRAJAYA: Chloroquine, a drug used for malaria, has been used to treat Covid-19 patients since the first wave of the outbreak in Malaysia and has shown its efficacy, according to Health director-general Datuk Dr Noor Hisham Abdullah (pix).

    He said the anti-inflammatory properties of the drug were effective in treating Covid-19 which caused inflammation in the lower respiratory tract.

    “When the Covid-19 virus attaches to the lower respiratory tract it causes inflammation and replication of the virus and this drug helps treat the inflammation,” he told a press conference, here today.

    Besides ‘Chloroquine’, Dr Noor Hisham said the combination of ‘Lopinavir and Ritonavir’ and Hydroxychloroquine have also been used by Ministry of Health (MoH) since the first wave of the outbreak.

    He said the drugs used in the first wave of the infection showed promising results in treating Covid-19, however, further research was still required.

    He explained that the number of deaths due to the virus had increased as the patients were either elderly, had comorbidities such as high blood pressure and kidney disease, or those who sought treatment at a later stage or after they began having breathing difficulties.

    “We have tried the drug and it is also part of a joint study with the World Health Organization called ‘Solidarity Trial’ involving many other countries,“ he added.

    He said besides those medicines, studies would also focus on the latest drug, ‘Remdesivir’ as announced yesterday.

    “This is only for research, and drugs that we have used off-label such as Lopinavir and Ritonavir, those we have been using since the first wave,“ he added. – Bernama

    ‘Chloroquine’ used to treat Covid-19 patients since first wave: Health DG
    Read More
    https://www.thesundaily.my/local/chloroquine-used-to-treat-covid-19-patients-since-first-wave-health-dg-FJ2193799

    Views: 0

  • Tokyo Games delayed to 2021

    Tokyo Games delayed to 2021

    Tokyo Games delayed to 2021 3

    TOKYO: The Tokyo Olympics were postponed today into 2021, the first such delay in the Games’ 124-year modern history, as the coronavirus crisis wrecked the last international sporting showpiece still standing this year.

    Though a huge blow to Japan, the decision was a relief to thousands of athletes fretting over how to train as the world headed into lockdown over the disease that has claimed more than 16,500 lives.

    Pressure had been building on the International Olympic Committee (IOC) and its powerful president Thomas Bach, with some athletes and sporting bodies critical of the time taken to make an inevitable decision.

    After a call with Bach, Japan’s Prime Minister Shinzo Abe said the July 24 – Aug 9 competition would be rescheduled for the summer of 2021 at the latest as proof of victory over the virus.

    “We asked President Bach to consider postponement of about one year to make it possible for athletes to play in the best condition,“ Abe said.

    “President Bach said he is in agreement 100%.”

    The IOC confirmed that.

    Athletes were disappointed but broadly endorsed the delay, given health risks and disruption to their training as gyms, stadia and swimming pools shut down around the world.

    US skateboarder and gold medal hopeful Nyjah Huston was frustrated, though, especially given his sport was scheduled to make its debut at the Tokyo.

    “When skating finally makes it in the Olympics then it gets postponed,“ the 25-year-old wrote on Instagram, after a delay had begun to look inevitable. “I was feelin (sic) ready too … now I’m going to have to be a year older for this!”

    Despite their disappointment, not to mention the logistical headaches and financial losses coming, a poll showed about 70% of Japanese agreed with a delay.

    Tokyo Governor Yuriko Koike told reporters the delayed Games would still be branded “Tokyo 2020”.

    It was not yet clear whether the 57 percent of athletes who had already secured spots in Tokyo would need to qualify again for the re-arranged Olympics.

    The torch relay was being cancelled. – Reuters

    Tokyo Games delayed to 2021
    Read More
    https://www.thesundaily.my/sport/tokyo-games-delayed-to-2021-IB2175857

    Views: 0

  • What “Cut Throat Kitchen” Can Teach You About Business

    I’m not a huge reality television show watcher, but what I do like to watch are competition shows. Whether it’s sports or competitive cooking, I like watching how people respond to pressure. (After all, as entrepreneurs we’re always under pressure!) ?Cut Throat Kitchen,? a new cooking competition show, is the perfect analogy for how we view ? and react to – challenges in our biz…

    Read More
    http://www.associationofmarketing.org/articles/view.php?article_id=13907

    Views: 0

  • Movement control order, time to take care of mental health: Lee Lam Thye

    Movement control order, time to take care of mental health: Lee Lam Thye

    Movement control order, time to take care of mental health: Lee Lam Thye 4

    KUALA LUMPUR: The two-week movement control order period is a time for everyone to take care of their mental health amid the Covid-19 outbreak.

    Befrienders KL patron Tan Sri Lee Lam Thye in a statement today said the disease which had been declared as pandemic could spark fear and cause anxiety as well as intense pressure among people from all walks of life.

    “Among the things that you can do to overcome fear is to limit your screen time…you can also do many other beneficial activities such as drawing, meditation, writing journals and praying.

    “Share positive and encouraging messages on social media such as stories of those who have recovered from Covid-19 or dedicated health care workers who work tirelessly and selflessly around the clock,” he said.

    Lee also advised those who live alone to stay in touch with their loved ones through phone and video calls.

    Those who struggle with stress or just need someone to talk to can contact Befrienders KL at 03-7956 8145 for emotional support, he added.

    Lee also advised the public to obtain verified information about Covid-19 from trusted sources such as the Health Ministry and the World Health Organisation.

    Meanwhile, he called on the government to provide psychosocial support especially to health workers in the frontline combating Covid-19. — Bernama

    Movement control order, time to take care of mental health: Lee Lam Thye
    Read More
    https://www.thesundaily.my/local/movement-control-order-time-to-take-care-of-mental-health-lee-lam-thye-ID2162813

    Views: 0

  • Netflix to reduce streaming quality in Europe to avoid internet overload

    Netflix to reduce streaming quality in Europe to avoid internet overload

    Netflix will reduce the quality of its streaming in Europe to ease pressure on the internet, the firm said, as demand soars across the continent where millions are confined to their homes over coronavirus fears.

    Read More
    https://techxplore.com/news/2020-03-netflix-streaming-quality-europe-internet.html

    Views: 0

  • France warns Amazon over ‘unacceptable’ pressure on workers

    France warns Amazon over ‘unacceptable’ pressure on workers

    French Finance Minister Bruno Le Maire accused Amazon on Thursday of placing “unacceptable” pressure on employees after unions claimed the retailer will not pay staff who refuse to go in to work fearing coronavirus contagion.

    Read More
    https://techxplore.com/news/2020-03-france-amazon-unacceptable-pressure-workers.html

    Views: 0

  • EU urges online media to ditch HD during virus

    EU urges online media to ditch HD during virus

    The European Union on Wednesday urged online media platforms to stream movies and entertainment in standard rather than high definition to relieve pressure on the internet during the coronavirus epidemic.

    Read More
    https://techxplore.com/news/2020-03-eu-urges-online-media-ditch.html

    Views: 0

  • Nintendo online gaming network back after major outage

    Nintendo online gaming network back after major outage

    Gamers breathed a sigh of relief on Wednesday after the end of a network outage that affected Nintendo’s online games, with internet-based systems under increasing pressure from people staying home over coronavirus.

    Read More
    https://techxplore.com/news/2020-03-nintendo-online-gaming-network-major.html

    Views: 0

  • Firemen take 12 hours to put out Pengerang blaze

    Firemen take 12 hours to put out Pengerang blaze

    Firemen take 12 hours to put out Pengerang blaze 5

    KOTA TINGGI: The Fire and Rescue Department of Malaysia (JBPM) needed more than 12 hours to extinguish the blaze at the Pengerang Integrated Complex’s diesel hydro treating (DHT) unit last night.

    Johor JBPM operations commander Pauzan Ahmad said this was because the blaze was too intense and the pressure from the DHT piping system was too strong.

    “There were too many pipes at the scene, while those which were leaking were 15 feet high.

    “So, we had to do some cooling first to stabilise the situation,” he told a press conference, here today.

    Pauzan said that it was only when the pressure from the pipes began to subside that they were able to start searching for the victims and found the first body at 3.56am.

    The second and third bodies were discovered at 4am, followed by the fourth (9.12am) and fifth (12.42pm).

    “The fourth body was found on fourth level of the unit’s platform while the others were found on the ground floor,” he said.

    He said, after that, they carried out “flushing” to remove any material inside the pipes before allowing the forensic team to go in and begin their investigations.

    Meanwhile, he said the firefighting operation involved 107 officers and personnel from six Fire and Rescue Stations, including from Sebana Cove, Bandar Penawa, Pasir Gudang and Larkin. – Bernama

    Firemen take 12 hours to put out Pengerang blaze
    Read More
    https://www.thesundaily.my/local/firemen-take-12-hours-to-put-out-pengerang-blaze-XC2136819

    Views: 0